Corporate Event AV Planning Checklist: The LED Layer

Production team planning an LED wall layout in a French conference hall

Most corporate event checklists start with the venue and treat AV as a line item to be filled in later. That sequence is why so many corporate events in France run into the same wall: the LED screen arrives after the staging plan is frozen, the power drop is in the wrong place, and the run-of-show carries a wall whose native resolution nobody briefed the content team on. The fix is simple but rarely done — put the technical layer on the checklist from day one, at the same time as the budget.

This checklist maps the AV and LED decisions to a corporate event timeline, from the first planning meeting to the post-event wrap-up. It is written for the organiser who has to brief a LED screen rental supplier in France and wants the technical milestones owned, not improvised. If your event also crosses the line between an in-room conference and a streamed audience, the production notes in our guide to AV for corporate events run alongside this checklist.

Why the AV layer belongs on the checklist from month one

Corporate events sit across departments that move at different speeds. Finance releases deposits on its own cycle. Marketing fixes the brand assets. The venue wants load-in schedules. AV is the one line that touches all three, which is why it fails first when it is booked late.

Three decisions made early remove most of the downstream pain:

  • Screen role and placement. Is the wall a keynote backdrop, a relay screen for an oversized room, or a sponsorship surface? Each drives a different size, pitch and content brief.
  • Native resolution. The wall’s native canvas is fixed by size and pitch, not by your slide deck. Design to it before the deck is built, not after.
  • Power and rigging route. French venues meter and order power, and route rigging through the technical régie. Both need lead time.

The corporate event AV timeline

The table below compresses a mid-size corporate event into technical milestones. Smaller events shorten the gaps but keep the order; for a fixed-room install rather than a one-off build, the decision path differs slightly, so see our guide to conference room AV setup.

Timeline AV / LED milestone Why it matters
9–6 months out Define screen role, room format and rough size Feeds the venue brief and the production budget before contracts are signed
6–4 months out Lock hall plan and truss heights; confirm power availability A wall sized for a 4 m ceiling looks lost under an 11 m ridge
4–3 months out Sign the AV contract; order metered power Power upgrades on site are expensive and sometimes impossible
4–2 months out Submit the dossier technique to the régie technique Late submission means the venue assigns your build slot
3–2 months out Brief content to the native resolution; storyboard the loop A 16:9 master letterboxes with black bars on a wider wall
2–1 months out Confirm rigging note, fire certificates and cable routes M1 or B-s1,d0 documentation is requested at walk-through
Final 30 days Rehearse the run-of-show on the actual wall Found here, the fix is free; found on show day, it is not
Show day Operate, monitor dead modules, manage cue changes Front-serviceable cabinets allow a single module swap mid-event

Budget: sizing the AV line correctly

AV is usually under-budgeted on the first draft because it is estimated from a photo rather than a spec. Build the number from four inputs instead.

  1. Wall area, not wall count. Cabinets are 500 × 500 mm modules, so a wall is built in 0.5 m increments. You cannot order 5.3 m — you build to 5 m or 5.5 m and design to fill it.
  2. Pixel pitch drives cost per m². A tighter pitch means more diodes per square metre and a higher rental rate. Match pitch to how close the audience sits, not to the biggest number in the brochure.
  3. Power. A 5 m P2.6 wall draws in the region of 3 to 4 kW at typical exhibition brightness. That belongs in the venue’s power application, not on move-in day.
  4. Labour and rigging. Venue-approved riggers and suspension calculations come through the technical channel, not from your own crew.

Pixel pitch and content: the decisions the checklist must not skip

The working rule across the rental trade is 1 mm of pixel pitch per 1 m of comfortable viewing distance. For a corporate plenary that maps cleanly.

Pitch Sharp from Corporate event placement
P1.9 ~2 m Close-up executive stages, text-heavy slides, small rooms
P2.6 ~2.5 m The default main-stage wall for seated corporate audiences
P3.9 ~4 m Large arena backdrops seen from across a hall
P4.8 ~5 m High hanging walls only, never for readable slide content
Technician connecting signal and power cables to the rear of an LED display cabinet
Signal and power routing belongs in the dossier technique — not in a move-in-day improvisation.

Then design to the canvas. A 5 × 2.5 m wall at P2.6 resolves to roughly 1920 × 960 — near-HD but wider than 16:9. Hand the designer the native dimensions and the black-bar problem disappears. The same briefing discipline applies to any stage elsewhere in the programme; our guide to live event production in Paris covers how a single wall serves several sessions in one day.

The one-page AV checklist

  • Screen role and size defined against the room and sightlines.
  • Native resolution calculated and handed to the content team.
  • Hall plan with truss heights and ceiling heights confirmed.
  • Metered power ordered with the load figure, not estimated.
  • Rigging note and venue-approved riggers arranged.
  • M1 or B-s1,d0 certificates for cabinets and rigging requested in writing.
  • Dossier technique submitted to the régie technique on time.
  • Load-in window, dock access and lift dimensions checked against flight-case pallets.
  • Run-of-show rehearsed on the actual wall.
  • Spare modules and a test pattern on the operator’s laptop.
Corporate conference plenary in France with a large continuous LED video wall behind the speaker
A main-stage wall sized to the room and pitched to the seating distance — the two decisions that decide how the plenary reads.

Who owns which AV task

Corporate events rarely fail on equipment; they fail on ownership. Assign each technical task to a named person.

Task Owner Risk if unowned
Screen spec and pitch AV supplier + producer Mis-specified wall, re-rental cost
Content to native canvas Marketing / design Black bars, cropped slides
Power order and load Production / venue On-site upgrade fees or refusal
Dossier technique Stand builder / producer Build slot assigned by the venue
Rigging approval Venue régie + rigger Wall cannot be suspended
Run-of-show rehearsal Producer / show caller Cue failures on show day

Where the event also carries an exhibition or partner floor, the AV owner should sit with the event-management lead from the start; running the programme and the technical layer as one plan is covered in our guide to conference event management in Paris.

Frequently asked questions

When should we book the LED wall for a corporate event?

Lock the spec and sign the AV contract about four to three months out, once the hall plan and power availability are confirmed. Earlier is better in peak season across Paris, Lyon, Marseille, Nice and Cannes.

Do we need fire certificates for a rental LED wall?

Ask for documented M1 or B-s1,d0 classification for the cabinets and rigging hardware in writing before the build. French venues request it at the technical walk-through.

Can we use one wall for both the keynote and the breakout sessions?

Often yes, if it is on a movable base or flown with a route that gets the wall close to the breakout. Plan the moves against the run-of-show so changeovers do not eat a session.

What happens if the wall’s resolution does not match our slide deck?

You get letterboxing — black bars on a wall you paid for. Always design the content to the wall’s native canvas, which is set by its size and pixel pitch.

Put the technical layer on the checklist first

The order that saves money is hall plan, screen role, pixel pitch, power order, dossier technique, then content. Everything else — catering, branding, run-of-show — slots in around a technical plan that was never going to move anyway. Send us your hall plan and draft agenda and we will return a wall size, pitch and power figure that fits the venue.